|
|
保护视力色: 【字号 大 小】 【收 藏】 【关 闭】 | |
渭南自2014年开始建设特高压工程,目前已有多条线路建成或在建。截至2015年3月底,渭南变压器厂经营区域内已建成“两交两直”特高压工程,这些特高压交、直流工程的成功建设和运行,全面验证了特高压技术的可行性、系统安全性、设备可靠性、工程经济性和环境友好性,也向世界展示了渭南电力装备制造企业的技术实力。 Weinan has multiple uhv engineering construction Weinan uhv engineering since 2014 construction, there are several routes built or under construction. By the end of March 2015, weinan transformer factory business has been built in the area of \"two alternating and direct\" uhv project, and the successful construction of the uhv ac and dc and run, fully demonstrated the feasibility of uhv technology, system security, equipment reliability, engineering economy, and environment friendly, also to show the world the weinan power equipment manufacturing enterprises of technical strength. Weinan transformer factory li believes that research and development of uhv power transmission and transformation equipment design and manufacturing technology of independent innovation, to realize the localization process of other low voltage grade equipment. This makes the domestic power equipment manufacturing enterprises in market competition both at home and abroad made a major breakthrough, weinan uhv equipment has become the power equipment manufacturing enterprises to the world gold card. Under nutrient-laden nantes drive of the successful practice of high-pressure, domestic enterprises accounted for power transmission and transformation of weinan dominance of the market, and to enter the international market, electric power equipment manufacturing industry has realized the high-end products exports zero breakthrough.
|
|
本网站(http://s110kv.com)刊载的渭南已建设多个特高压工程等版权均属于汇德变压器厂,未经http://s110kv.com授权不得转载、摘编或利用其它方式使用上述作品。本网站渭南已建设多个特高压工程如原作者不愿意在本网站刊登内容,请及时通知本站,予以删除,谢谢合作。 | |
请发给您身边需要的朋友:渭南已建设多个特高压工程 | |